You do not want scheduling permission In case the area for being covered is below 5 sq. metres or if the new surface area is permeable or porous, or if a conventional floor is laid but the rainwater is directed into a garden or border to empty In a natural way or via a soakaway.We are a leading unbiased relatives run driveway company furnishing our